Alamo 60C Operator's Instrukcja Operatora Strona 59

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 138
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 58
OPERATION
BH20 Series 04/13 Operation Section 4-13
© 2013 Alamo Group Inc.
OPERATION
8. Extend the tractor’s top 3-point link so that
when lifting the mower, the front of the deck will
raise 2 to 2½” before the tail wheel leaves the
ground. This will allow the mower to follow the
contour of uneven terrain.
Note: Install optional check chains when there is a
problem with the hydraulic 3-Point lift maintaining a
set height or when a constant pre-adjusted cut
height is required. See Check Chains in the
Assembly Section for this accessory.
Przeglądanie stron 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 137 138

Komentarze do niniejszej Instrukcji

Brak uwag